Make frontline execution reliable on the shop floor
Workerbase ensures frontline work gets executed, verified, and followed through automatically -- between your ERP/MES and the people doing the work.

Used daily by 6,000+ frontline workers across 60+ plants.
Operators use it voluntarily because it removes friction instead of creating it.
- First workflow live in ~2 weeks.
- Measurable proof in 60 days
The problems you will recognize immediately
Execution gaps create scrap, rework, downtime, and audit risk when work is assumed instead of verified.
Shift handover
Notes get lost and quality issues are discovered too late.
Changeover
Wrong parameters lead to avoidable scrap and delays.
Machine alarms
Reset without logging leads to late escalation.
Quality checks
Skipped inspections cause defects to accumulate.
Process changes
Updates are not consistently adopted across shifts.
Line clearance
Verification is assumed and contamination risk rises.

Why you keep seeing these problems
Your systems tell you what should happen.
Nobody verifies it actually happened until it's too late.
That's where execution breaks. Every day.
Whether you run discrete lines or continuous processes, execution breaks between systems, shifts, and people.
Who this is built for
Manufacturing environments where:
- Humans are the execution layer
work can't be fully automated
- Verification matters
you need proof work actually happened
- ERP/MES can't enforce critical frontline execution steps
Production types
- High-variability discrete production
Mixed-model lines, custom orders, frequent changeovers (Automotive, industrial equipment, electronics, consumer products)
- Batch and flow production
Recipes defined, but execution depends on people following through (Pharma, food & beverage, process industries, chemicals)
- Hybrid & cell-based production
Job shops, assembly cells, make-to-order
Talk to us
If Frontline Execution Matters: This Is For You.
What Workerbase Does For Your Operations

1. Creates work automatically
Tasks are generated from ERP/MES with clear ownership and sequence.
- No supervisor involvement.

2. Guides execution where it happens
Operators see the right steps, BOM, revision at their station, on any device.

3. Verifies it actually got done
Each step confirmed.
- Skipped steps trigger automatic escalation.
- Execution confirmed, not assumed.

4. Nothing falls through cracks between shifts
Incomplete work carries over with full context.
- Zero information loss.

5. You see where execution breaks Real-time
Station 7 skipped torque check 3x this week.
- Fix the pattern, not the incident.
Most plants start with what causes the most pain
Why you should be suspicious (and why this holds up)
Proof without long implementation
If execution doesn't measurably improve, pilot ends with no long-term commitment.
Week 1-2
Discovery and first workflow setup
Identify your most pressing issue and configure one real workflow together.
Week 3-5
Live on one line, one shift
Go live with your teams and refine in real conditions.
Week 6+
Measured outcomes for leadership
Take clear results to leadership and decide how far to scale.
See the difference in implementation
Why implementing Workerbase is not an MES project
Plants like yours use Workerbase daily
12-15% productivity improvements
with 10+ use cases per factory
35% reduction in production downtime
3,500 additional bikes produced per year
80% of manual shop floor processes automated
by standardizing and digitizing shop floor execution
Transforming manufacturing together
“The Workerbase platform ensures that our processes run smoothly, issues are resolved quickly and production operates with fewer interruptions.”
Jens Brücker
Vice President Plant Zuffenhausen, Porsche
Three reasons you might still hesitate
Most teams start small, prove impact fast, and scale once the value is visible.
Not now -- Too much going on
Every day you wait is another day execution gaps cost you money.
Need buy-in from IT, Corporate, Ops
Start with one workflow on one line. Proof beats PowerPoint.
We've been burned by execution software before
Prove value in 60 days and decide based on outcomes.
Fix your execution gap
See how this looks in your environment
- Configured for your workflow
- Focused on measurable value
- Clear fit from the first call
- No long implementations